J-U-B was hired by the DFCM to design the replacement of the existing Bear Lake Marina docks. The two-phased project includes new docks, electrical, and fiber conduits.
Under the direction of Project Manager Zan Murray, our team was responsible for quality control/quality assurance, project status, budget and schedule monitoring, design, and construction administration.
The Marina, originally constructed in the 1960s, has 376 slips, storing boats of all sizes.