Archives for March 2022

February 10, 2015

TheCache Water Restoration Project (CWRP) enclosed six miles of open canal in box culvert, concrete pipe, HDPE pipe and PVC Pipe to restore water to irrigation shareholders that was lost in 2009 from a breech in the canal.

Read more
February 10, 2015

In July 1999, DWCCC’s main canal breached in Riverdale, Utah causing flooding and significant damage. J-U-B was brought in to design the repairs through the breach and to prepare and execute a Long Term Plan for the design and construction of improvements for nine miles of canal through South Weber and Riverdale.

Read more
Search
Categories
Archives